
Maintenance 67
jina85e 6.fm Technical Handbook(1112)
6.2 Replacing Hoses
Notice Measurement hose and reference hose must have the same length.
Notice Apply grease to the outside of the ends of the green measurement lines in
a thin film to be able to slide them into the connections until they snap in.
Otherwise it can happen that they are not deep enough in the connector
and measuring errors can appear.
1 Push on the ring of the connection and pull the hose out.
2 Insert the new hose into the connection.
Fig. 7-3 Hose connections of the T-Guard™ Leak Detection Sensor
Item Description Item Description
1 Ring of connector 2 Hose
Comentários a estes Manuais